| SUGGESTED SPECIFICATIONS
PART 1 - GENERAL
1.1 SCOPE
To furnish all labor, materials and equipment necessary or required to
complete the installation of the lift as indicated on the Drawings and
Specifications. This specification is intended to cover the complete installation
of the Concord PAL-SE (SEMI-ENCLOSED) Vertical Wheelchair Platform Lift
design.
1.2 SYSTEM DESCRIPTION
Lift assembly shall consist of a platform, guide system, panels and gates,
1:2 cable hydraulic lifting device, control system, signals and alarms,
electrical wiring, and parts and accessories necessary to provide required
performance operation and code and safety requirements.
1.3 QUALITY ASSURANCE
1.3.2 Requirements of the Regulatory
Agencies
a) Fabricate and install work in compliance with all applicable jurisdictional
authorities.
b) File shop drawings and submissions to local authorities as the information
is made available. Company pre-inspection and jurisdictional authority
inspections and permits are to be made on a timely basis as required.
Work will include all inspections and re-inspections required to ensure
licenses are issued.
1.3.3 Subcontractor Qualifications
a) Execute work of this specification only by a contractor/company who
has adequate product and public liability insurance in excess of one million
dollars.
b) Skilled tradesmen must be employees of the contractor and perform the
work on a timely basis. Employees must be trained by the manufacturer
and be supervised by the lift contractor.
1.3.4. Substitutions
No substitutions will be considered unless written request for approval
has been submitted by the bidder and received by the architect at least
10 days before the date of receipt of bids. Each such request shall include
a complete description of the proposed substitute including drawings,
test data, photographs, and any other information needed for consideration.
PART 2 - PREPARATORY WORK BY OTHERS
2.1 The following preparatory work to accommodate the lift is to be done
by others:
2.1.1 Permanent 110 volt 15 amp power to operate the lift to be provided
from a Lockable Fused Disconnect Switch, lockable in the off position
with a secondary switch within the main Disconnect. Refer to architectural
drawings for permanent power specifications and location of disconnect.
Temporary power may be provided to expedite the installation of lift.
2.1.2 Provide clear access to lift installation location and remove all
obstacles before lift delivery and installation.
2.1.3 Provide adequate overhead clearances as required by the applicable
code and as per drawings.
2.1.4 Provide a substantial level floor (pit) slab as indicated on lift
contractors’ shop drawings.
2.1.5 Provide finish grouting, and masonry around walls, ceilings, and
doors.
2.1.6 Provide adequate lighting at lift areas as required by the applicable
code.
PART 3 - SUBMITTALS
3.1 SHOP DRAWINGS
The shop drawings shall show a complete layout of the lifting equipment
detailing dimensions, clearances and location of lift equipment. Including
the following:
a) Drawings showing the dimensions including plans, elevations, and sections
to show equipment locations and their relationship to surroundings.
b) Anchorage and clearance requirements.
c) Load and reaction drawings.
|
3.2 SAMPLES
|
PART 4 - PRODUCT DATA
4.1 MANUFACTURER / PRODUCT
Lift shall be the Concord PAL-SE (SEMI-ENCLOSED) Vertical Wheelchair Platform
Lift by: Mobility Elevator, 4 York Avenue, West Caldwell, NJ - PH: (800) 441-4181 or (973) 618-9545 - FAX: (973) 618-9638
|
| Rated Load: |
750 lbs. (341 kg) |
| Normal Speed: |
15 fpm (0.04 m/s) |
| Platform Dimensions: |
|
| Levels Served: |
2 |
| Travel Distance (Max. 14 '): |
See Drawings __________________ |
| Operation: |
Constant Pres |
| Power Supply: |
110 Volts, 1 Phase, 15 Amps min. |
| Drive Type: |
1:2 Cable Hydraulic |
| Emergency Operation: |
Travel UP and DOWN Direction, 24 Volt DC automatic
recharging battery system
|
| Paint: |
Baked Electrostatic Polyester Gloss
Powder |
4.2 SIGNAGE
4.2.1 The lift shall have all necessary signs, capacity plates, and data
signs as per the Local and national Codes and Standards.
4.2.2 A capacity plate indicating the rated load in pounds and kilograms
and operating instructions shall be furnished by the manufacturer and fastened
in a conspicuous place at each landing and in the platform. The capacity
plate and operating instructions will be engraved on non-glare, micro-surface,
white letters on a blue background, self-adhesive, flexible plastic material.
The letters and figures stating the capacity shall not be less than 1/4"
in height.
4.3 LIFT PLATFORM (CAR)
4.3.1 FRAME AND SIDE GUARD PANELS
Aluminum platform frame 42 1/4" high (1073 mm) with steel insert.
4.3.2 FLOOR
Formed steel with anti-skip sheeting.
4.3.3 GRAB RAIL
A single grab rail with both ends returned to the wall shall be located
on the control wall of the carriage.
4.3.4 CAR OPERATING PANEL
Shall consist of constant pressure illuminated buttons,, an emergency stop
and alarm button, and an ON/OFF key switch mounted on a removable stainless
steel panel (type 304 #4 stainless steel finish). The key shall only be
removable when the key is in the OFF position.
4.4 SEMI-ENCLOSURE
4.4.1 The Vertical Platform Lift will be equipped with a self closing
lower entrance, platform gate, and top landing gate. The lower landing
and platform gates will open simultaneously when at the lower landing.
4.4.2 The non-exit sides of the platform are protected by 42 1/4" high
platform walls.
4.4.3 An aluminum frame enclosure with steel inserts
that extends a minimum of 4" above the upper landing is provided around
the platform to prevent access to the underside of the platform. A smooth
vertical fascia or wall shall be fastened securely from the upper landing
sill to the lower landing sill.
4.4.4 All gates are to be equipped with interlocks to prevent them from
opening if the unit is outside the door zone.
4.5 PUMP UNIT AND CONTROLS
The drive unit and controller shall be enclosed in the mast. The controller
and pump unit shall be pre-wired and tested before shipment. Control circuitry
is to be PCB mounted as an integral unit. The pump unit shall included
the following features:
4.5.1 Smooth stops at each landing shall be an inherent feature.
4.5.2 Adjustable pressure relief valve.
4.5.3 Manually operated DOWN valve to lower the lift in an emergency.
4.5.4 Pressure gauge with quick connect fitting.
4.5.5 Pressure gauge isolating valve (shut off valve) manually operated.
4.5.6 Gate valve to isolate cylinder from the pump unit.
4.5.7 Fixed pressure compensator flow control valve to set maximum DOWN
direction speed regardless of load.
4.5.8 Electrical solenoid for DOWN direction control.
4.5.9 Emergency power raising and lowering by battery power.
4.6 CYLINDER AND PLUNGER
4.6.1 The cylinder shall be constructed of steel pipe of a sufficient
thickness and suitable safety margin. The top of the cylinder shall be
equipped with a cylinder head with an internal guide ring and self-adjusting
packing.
4.6.2 The plunger shall be constructed of a steel shaft of a proper diameter
machined true and smooth. The plunger shall be provided with a stop electrically
welded to the bottom to prevent the plunger from leaving the cylinder.
4.7 LEVELING DEVICE
4.7.1 The lift shall be provided with an anti-creep device which will
maintain the carriage level within 1/2" (13 mm) of the top landing.
4.7.2 All limit switches and leveling device switches shall be located
in a position to be inaccessible to unauthorized persons.
4.8 PIT SWITCH
Switch to be located at the base of the mast that when tripped will remove
electrical power to the control circuit and stop the operation of the
car.
|
4.9 CABLE
Minimum two (2) 3/8" (10 mm) IWRC Galvanized Aircraft Cables with a minimum
breaking strength of 14,400 lbs. each.
4.10 SAFETY DEVICE
A slack/broken cable safety device shall be supplied that will stop and
sustain the lift and its rated load, if either of the two hoisting cables
become slack or fail. The safety device shall be resettable by the operating
of the lift in the UP direction. A switch shall be mounted in such a position
to sense the operation of the safety device and will open the safety circuit
to the controller to prevent operation of the lift in either direction.
|
4.11 GUIDE YOKE
A 1:2 guide yolk/sheave arrangement shall be supplied with a sheave, guide
shoes, roller bearings and adjustable cable guards. The sheave shall be
furnished with rounded grooves to fit the cables.
4.12 NORMAL TERMINAL STOPPING DEVICES
Normal terminal stopping devices shall be electro-mechanically sensed
at the top and bottom of runway to stop the car automatically.
4.13 FINAL LIMIT STOPPING DEVICE
A final stopping device shall be electrically sensed and stop the lift
should the lift pass the upper normal terminal stopping device and remove
the electrical power to the control circuit.
4.14 GUIDE RAILS AND BRACKETS
4.14.1 Steel "T" guide rails and brackets shall be used to guide the platform
and sling.
4.14.2 Guide rail shall form part of the structural integrity of the unit
and be integral to the mast enclosure, ensuring stability and minimum
platform deflection when loaded.
4.15 CAR SLING
4.15.1 Car sling shall be fabricated from steel members with adequate
bracing to support the platform and car.
4.15.2 Guide shoes shall be mounted on the top and bottom of the car sling
to engage the guide rails.
4.15.3 Guide shoes to be solid slipper type.
4.15.4 The car sling arms shall be detachable.
4.16 WIRING
All wiring and electrical connections shall comply with applicable Codes,
insulated wiring shall have flame retardant and moisture proof outer covering
and shall be run in conduit or electrical wire ways.
|
4.17 FINISH
Electrostatically applied baked polyester powder coating paint finish.
PART 5 - EXECUTION
5.1 EXAMINATION
All site dimensions shall be taken to ensure that tolerances and clearances
have been maintained and meet local regulations.
5.2 PREPARATION
Pre-inspect the construction and service requirements for "Work by Others."
These requirements will be included in drawings, diagrams, engineering
data sheets and special instructions before the work commences.
PART 6 - WARRANTY
The lift contractor shall provide three (3) months free service from
date of approval by local authorities. The entire lift and all component
parts shall carry a one (1) year limited warranty. The warranty shall
be for the replacement at no cost of defective parts but shall not include
the labor costs required to replace the defective part or parts.
PART 7 - OWNER’S INSTRUCTION AND MANUAL
After installation is completed, the contractor shall instruct the
owner in the proper use, operation and maintenance requirements of the
lift. Instructions to also include emergency procedures and safety rules
and precautions. Contractor shall also supply the owner with an Owner’s
Manual detailing the operating, safety, and maintenance procedures of
the lift.
|
|
|